Installed full Wi-Fi network, CAT/6A shielded solution within the existing facility
Futureproof for new Wi-Fi technology supported by dual outlets at all wireless access point locations
Strategic planning between client IT Manager and Shamrock Communications Service Manager resulted in smooth delivery of the project
Installed new copper and fibre backbone between main communications room on the ground floor of Building A to secondary communications room on level 3 of Building C
The client's Operations Manager was delighted with our on-site team and their adaptability to the ever-changing environment of the facility on a daily basis